South Fayette Township

Road Projects & Traffic Alerts




ROUTE 50 WORK SET FOR AUG. 14 TO AUG 23

Pavement sealing is set to occur on Route 50 from Aug. 14 through Aug. 23, PennDOT announced.

Temporary lane closures are possible daily from 9 a.m. to 3 p.m. from Route 60 in Crafton Heights to Interstate 79 in South Fayette.



INTERSTATE 79 RESURFACING & MILLING PROJECT

July 24, 2014 – late September 2014

 

PennDOT has announced that road work will occur in both directions of I-79 between the Bridgeville/South Fayette interchange (Exit 54)

and Campbells Run Road in Robinson.

 

Traffic restrictions:

• Single lane in each direction from 9 p.m. to 5 a.m. Monday-Friday nights.

• Reduced to two lanes in each direction from 7 p.m. to 9 p.m. and 5 a.m. to 6 a.m. Mondays-Fridays.

• Single lane in each direction from 10 p.m. to 10 a.m. Saturdays and Sundays.

• Reduced to two lanes in each direction from 6 p.m. to 10 p.m. Saturdays and Sundays.

• Work will not begin until two hours after the end of any Pirate, Penguin or Steeler home game.

 

Plus, traffic will be detoured at times for work on the I-79 Heidelberg/Collier (Exit 55) and Carnegie (Exit 57) ramps. (More info TBA)


 

 

Return To Home Page